SMM7: Standard Method of Measurement of Building Works

£9.9
FREE Shipping

SMM7: Standard Method of Measurement of Building Works

SMM7: Standard Method of Measurement of Building Works

RRP: £99
Price: £9.9
£9.9 FREE Shipping

In stock

We accept the following payment methods

Description

Definition : Roof lights and lantern lights including framing and glass. Includes other structure sundries (excluding reinforced concrete). The rules were updated every 10 years or so with the 7 th edition – SMM7 – published in 1988. In 2006, SMM7 was due to be updated to SMM8, but following an investigation by a RICS quantity surveying and construction professional group into current practices, it was decided that new standards were required to encourage best practice and, reflect changes in construction processes and working practices since the original SMM was created more than 80 years previously. GROUP ELEMENT : 04 - MECHANICAL & ELECTRICAL SERVICES ____________________________________________________________________________________________________ Element : AC - Air conditioning cont’d

Definition : Includes for all work associated with the installation of uninterruptible power supply system.GROUP ELEMENT : 04 - MECHANICAL & ELECTRICAL SERVICES ___________________________________________________________________________________________________ Element : AC - Air conditioning cont’d Definition : Basements, lift and escalator pits including bulk excavation, external walls, tanking and filling around external walls. Including diaphragm walls and barrettes. Definition : Includes for all works associated with ventilating installation specifically designed for removal Definition : Includes for all works associated with the provision of mechanical ventilation and air-conditioning including all pipework, insulation, ducting, fan motors, chillers and other plant and equipment, including boilers and unitary air conditioners.

K. Abd Rashid, In Need of Studies to Assess the Effectiveness of Bills of Quantities, in 10th Management in Construction Research ( MiCRA) Conference (2011) For the first time, all three volumes of the New Rules of Measurement (NRM) suite have been published at the same time. The updated suite consists of three separate volumes: Exclusions : Sprinkler system. Feeds to hose reels etc. (see FS). Hose reel cabinets (see FF). Alarm systems (see FS). In essence, SMM plays a pivotal role in the construction industry, providing a framework that helps professionals navigate the complexities of building works measurement. Its guidelines and procedures have been widely adopted and influence construction practices today. History of SMM7 Evolution and Impact of SM M7 Definition : Includes for all works associated with mechanical ventilation installation including ventilation

More insights

The RICS New Rules of Measurement – Detailed Measurement for Building Works (NRM2) has been published and the Joint Contracts Tribunal (JCT) has issued an update with amendments for JCT main contracts and sub-contracts. In essence, the contents of SMM7 serve as a comprehensive guide for measuring building works. Its guidelines and procedures provide a solid foundation for the preparation of bills of quantities and cost estimates, promoting accuracy and efficiency in the construction industry. SMM7 in Practice Application and Benefits of SMM7 Definition : Includes all forms of sewage treatment, e.g. septic tanks, filtration beds and the like. Exclusions : Columns, fins and projections where part of columns and beams, infill panel walls and other non-structural walls (see EW & IP). Definition : Sanitary fittings including sinks, basins, WCs, urinals, complete with taps, traps, cisterns etc.



  • Fruugo ID: 258392218-563234582
  • EAN: 764486781913
  • Sold by: Fruugo

Delivery & Returns

Fruugo

Address: UK
All products: Visit Fruugo Shop